Project Description

Portfolio overview

SNOWY HYDRO 2.0

CLIENT
LOCATION

NSW

PROJECT DURATION

2019-2028

PROJECT SCOPE

At VFT Engineering Surveyors, we are proud to be a part of the Snowy 2.0 project, which marks the next significant chapter in the illustrious history of the Snowy Scheme. Snowy 2.0 stands as a monumental, nation-building endeavor in the realm of renewable energy, promising enduring benefits for generations to come.

This project represents the largest committed renewable energy initiative in Australia, and its significance is paramount. Snowy 2.0 will play a pivotal role in ensuring our nation’s secure and seamless transition toward a low-carbon emissions future, all the while keeping costs minimal for consumers.

The undertaking involves the intricate task of connecting two existing dams, Tantangara and Talbingo, through an extensive network of 27 kilometers of tunnels, alongside the construction of an innovative underground power station.

A key aspect of Snowy 2.0 is its ability to adapt to energy supply and demand dynamics. When renewable energy production surpasses immediate requirements and energy demand is low, water will be efficiently pumped to the upper dam. Conversely, during times of peak electricity demand, the stored water will be released back into the lower dam, effectively generating energy.

This project’s unique design allows it to offer flexible, on-demand power solutions while adhering to a closed-loop water system that embraces the principles of recycling. The surplus solar and wind energy will be harnessed to pump water to the higher dam, where it will be stored for future use, thus maximizing the efficiency of renewable resources.

HOW ARE VFT HELPING?

Snowy 2.0 truly stands as a groundbreaking initiative, and we are honored to contribute to this historic venture as it paves the way for a cleaner, more sustainable energy future for all Australians.