Project Description

ROY HILL MINE INFRASTRUCTURE

CLIENT
LOCATION

Pilbara region, WA

CONTRACT 1

Roy Hill is an $8bn project based in the Pilbara region of Western Australia. VFT were contracted to deliver all survey resources for the Civil and SMP components of the mine infrastructure. Our role included working with the design review team in Perth and then providing all facets of surveying for the construction teams.

VFT surveyors installed the new survey control network for the 10km of overland conveyors and the interlinked mine structures. VFT then provided set out and as-built surveys of the mine structures. The Roy Hill Mine Infrastructure project is the biggest development VFT have been engaged to date.

CONTRACT 2:

VFT are providing the auditing surveyors for Samsung C&T for the Roy Hill Infrastructure Project. The role includes;

  • Joint audit surveys
  • Maintaining the control network and installing new control
  • Per-pour survey checks
  • As-built survey checks
  • Design reviews
  • Volumes calculations, pre and post-build
  • Quality validation
CONTRACT 3:

Finishing works – Rail.